Brentford
Waterside

Hounslow

Formation Architects have been appointed to deliver the first phase of the Ballymore Brentford High Street and Waterfront project from Stage 3.

  • Client: Ballymore
  • Size: Phase 1: 317 private units in 3 blocks; leisure / cultural uses with Cinemas, a Leisure Centre / Gym and Community uses; retail spaces including a major supermarket and 4,000 m2 of commercial space, with a large underground car park.
  • Status: In construction
  • Sectors
    Mainstream Residential, Private Development
  • Services
    Construction Delivery, Construction Documentation, BIM

The Project will create a high density low rise mixed use waterside community bounded to the north by the revitalised High Street and to the south by the rediscovered waterways. A series of yards and lanes will seamlessly reconnect the High Street with the waterfront.


The designs have been taken to Stage 3 by Allford Hall Monaghan Morris, Glenn Howells Architects and MaccreanorLavington. The development combines residential, retail, community and leisure uses.

There are approximately 14,000 m2 of new retail, as well as leisure and commercial uses, and a gym / leisure centre. It retains and re-uses several heritage buildings.

The Project will create a high density low rise mixed use waterside community bounded to the north by the revitalised High Street and to the south by the rediscovered waterways.

Next Case Study:

Charterhouse

Formation Architects were brought in at construction stage to assist with the design development, construction drawings and site works for the external façades, roofs and terraces of this highly complex refurbishment project.